Cat C2.8
The C2.8 and C3.6 IPU engines are common rail direct injection engines with a turbocharged or turbocharged aftercooled air system meeting EU Stage V, U.S. EPA Tier 4 Final and Japan 2014 (Tier 4 Final) emission standards. For ease of installation, the IPU provides full aftertreatment mounting, an integrated cooling system, a full wiring harness and mounting for the ECM and fuel filter.
Designed to meet EU Stage V/U.S. EPA Tier 4 Final/ Japan 2014 (Tier 4 Final) emission standards.
Specifications
Power Rating
Maximum Power | 55 kW |
Maximum Torque | 300 Nm @ 1600 rpm |
Rated Speed | 2200-2400 rpm |
Minimum Power | 55 kW |
Emission Standards
Emissions | EU Stage V/U.S. EPA Tier 4 Final/ Japan 2014 (Tier 4 Final) |
General
Number of Cylinders | 4 inline |
Cycle | 4 stroke |
Bore | 90 mm |
Stroke | 110 mm |
Displacement | 2.8 l |
Compression Ratio | 17.0:1 |
Aspiration | Turbocharged |
Combustion System | Direct injection |
Rotation from Flywheel End | Anti-clockwise |
Aftertreatment | DOC+DPF |
Cooling System | Liquid |
Engine Dimensions*
Length | 1191 mm |
Width | 809 mm |
Height | 966 mm |
Dry Weight | 511 kg |
Disclaimer
Note 1 | *Final dimensions dependent on selected options |
Benefits & Features
Ready to go for machine installation
The ECM, aftertreatment sensors and fuel filter have all been mounted on the IPU and validated to operate in the harshest of environments.
A bespoke wiring harness has also been developed to allow for a simple hookup to the machine wiring.
For the quickest installation possible, an optional engine control panel for engine monitoring and speed control is also available.
Reliable, quiet, and durable power
World-class manufacturing capability and processes coupled with proven technologies and extensive field validation assure reliability and durability in tough non-road applications
Zero downtime for regeneration
Diesel Oxidation Catalyst (DOC), Diesel Particulate Filter (DPF), and on the C3.6 Selective Catalytic Reduction (SCR) system supplied installed on-engine to provide zero downtime for regeneration